New Martview RB-03----EMMS UFS297 chip welding operation tutorial and video

Martview

Staff member
Administrator
Feb 25, 2017
741
917
Malaysia & Australia

Martview RB-03----EMMS UFS297 chip welding operation tutorial and video

Operation video:

Operation tutorial:

1. Install the chip which needs to soldering.

a. Knob adjusts lateral movement of the chip holder Module, inward or outward simultaneously.

b. Large turntable adjusts the longitudinal movement of the two chip holder modules, inward or outward simultaneously.

c. Turn the screw to lock the turntable to prevent accidentally touching the turntable and causing the fixed chip to fall off.


15.jpg

2. Cleaning the tin balls, also be used for chip glue removal.

16.jpg

3. Put stencil net and alignment position.




4. Set Stencil Net Positioning Module Height.

The four corners are marked with scales and direction marks. The scales can be better set to support chips of different thicknesses.

The direction marks can quickly distinguish the up and down movement methods.



5. Apply Solder Paste.



6. Use hot air stations to heat, start by slowly heating from one corner inward.



7. Complete tin planting


 
Top