New Martview RB-03----EMMS UFS297 chip welding operation tutorial and video

Martview

Staff member
Administrator
Feb 25, 2017
847
970
Malaysia & Australia

Martview RB-03----EMMS UFS297 chip welding operation tutorial and video​

Operation video:​

Operation tutorial:​

1. Install the chip which needs to soldering.​

a. Knob adjusts lateral movement of the chip holder Module, inward or outward simultaneously.​

b. Large turntable adjusts the longitudinal movement of the two chip holder modules, inward or outward simultaneously.​

c. Turn the screw to lock the turntable to prevent accidentally touching the turntable and causing the fixed chip to fall off.​


15.jpg

2. Cleaning the tin balls, also be used for chip glue removal.​

16.jpg

3. Put stencil net and alignment position.​




4. Set Stencil Net Positioning Module Height.​

The four corners are marked with scales and direction marks. The scales can be better set to support chips of different thicknesses. ​

The direction marks can quickly distinguish the up and down movement methods.​



5. Apply Solder Paste.​



6. Use hot air stations to heat, start by slowly heating from one corner inward.​



7. Complete tin planting​


 
Top